Construction of the NHERI TallWood building in March 2023, with a crane hoisting a mass timber panel that was installed as part of the rocking wall. (Credit: David Baillot, Jacobs School of Engineering, University of California San Diego)

Construction of the NHERI TallWood building in March 2023, with a crane hoisting a mass timber panel that was installed as part of the rocking wall. (Credit: David Baillot, Jacobs School of Engineering, University of California San Diego)

Construction of the NHERI TallWood building in March 2023, with a crane hoisting a mass timber panel that was installed as part of the rocking wall. (Credit: David Baillot, Jacobs School of Engineering, University of California San Diego)

Latest posts by Rachel Crowell (see all)